Best resource scheduling software: 2026’s top 11

Best resource scheduling software illustration.

Out of a sample of over 3,000 buyers, 60% have regretted a software purchase decision in the last 18 months according to Capterra’s 2025 Tech Trends Report. 

This article’s here to stop you from becoming part of that statistic. 

If you’re on the hunt for the best resource scheduling software for the first time, or you’re interested in switching solutions, this post breaks down details of some of the most respected tools on the market to help you make an informed decision. 

Just so we’re all on the same page, let’s clarify what these kinds of solutions are. In terms of looking for the best resource scheduling software out there, we’re looking for solutions that specifically help you plan when to allocate people and resources to work, based on who and what’s available. 

Now, let’s find the best option for your business. 

Frequently asked questions

What is resource scheduling software?

Resource scheduling software is used to allocate and manage people and resources’ availability effectively across projects, teams, or departments. It’s the process of allocating tasks to the right people and resources at the right time to avoid conflicts, overbooking, or underutilization.

What are the benefits of using resource scheduling software? 

Resource scheduling software helps teams use their time more efficiently by avoiding overbooking and excessive downtime. It makes project planning easier—as it offers a clear view of who’s available and when—cuts down on scheduling conflicts, and gives real-time insight into everyone’s workload. Plus, it offers useful data to spot trends and improve future planning.

Evaluation criteria for the best resource scheduling tool

I’ve been working in SaaS for over a decade, a large part of which I’ve personally spent evaluating, writing about, and buying software. In that time, I’ve learned quite a bit about what to look out for when it comes to finding suitable solutions. Based on that experience, here’s what I chose to look into when trying to find the best resource scheduling tools out there: 

1. User ratings

I took the average review score from two of the most popular software review sites: G2 and Capterra. This score reflects the overall opinion of verified users for each of the options, and serves as a good baseline for how happy the user base is. 

2. Trial period

One of the most effective ways to figure out if a tool will work for your specific use case is by trying it out. Some options offer a longer free trial period, giving you more time to get a feel for the software before you commit. Worth considering if you have a defined timeline during which you have to choose a solution.

3. Pricing

It’s safe to say you can rule out an option if it doesn’t fit your budget. As such, I’ve included pricing details for paid plans, where that info is available. I’ve tried to standardize as much as possible, so I’ve listed prices per month in USD across the board. For accuracy, I’ve also listed where that price is per person, user, or seat, using the same language each platform advertises. 

4. Key features

There may be certain features you can’t live without when it comes to the best resource scheduling tool for you. Especially if you’re switching from an existing solution. For this reason, I’ve broken down 11 key features and checked if each solution offers them. 

5. Does it solve typical user problems?

I also wanted to evaluate the day-to-day experience of using each of the tools. So, I chose three typical goals users want to achieve with software like this and tested them out based on those criteria. Specifically, I wanted to answer three questions: “Using [insert software name here] can I…”

  1. Understand what everyone’s workload is like and avoid overbooking or causing schedule conflicts?
  2. Understand how utilized the team are and ensure the workload is distributed fairly?
  3. Make changes on the fly, and at the last minute?

I chose these three tasks for a few reasons. First, preventing overbooking and clashes helps tackle overworking and prevents employees from delivering lower quality work off the back of it. 

Understanding utilization and workloads also helps avoid overburdening staff. Plus, it plays an important part in preventing unnecessary downtime that can leave money on the table. 

When it comes to making changes on the fly, project managers—or just about anyone scheduling people and resources—will tell you flexibility is key. No matter how meticulously you lay out your project plan, things change. And, you have to be able to react almost instantly to keep initiatives on-track, and profitable. 

6. Overall pros and cons

Using G2 and Capterra again, I looked into some of the main reasons people either enjoy using each piece of software, or find it less than ideal. This can help paint a more detailed picture of what the typical user’s overall experience looks like. 

With that out of the way, let’s see how each of the best resource scheduling software solutions we could find performed in those regards.

1. Resource Guru

User reviews 

Trial period

Free for 14 days

Pricing

From $5/person/month

Resource Guru schedule screenshot.

Key features 

Does it solve typical user problems?


Using Resource Guru, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

Resource Guru makes it easy to avoid, and solve for, both. 

Resource Guru clash management.

  • You get granular control over everyone’s availability, meaning you have a true picture of when everyone’s working
  • You can use tentative bookings to keep unconfirmed work on your radar, and prevent it from sneaking up on you and eating up someone’s availability at the last minute
  • Resource Guru’s unique clash management system actively prevents overbooking
    • If a person or resource doesn’t have sufficient availability for the booking you’re trying to make, you’ll see a booking clash with three options: Add to Waiting List, Add with overtime, or Add without overtime (extend availability). This means you can immediately tackle any potential clashes before they become problematic
    • If someone is booked for time off that overlaps with bookings that have already been made for them, those bookings can also be added to the Waiting List
  • The Waiting List mentioned above shows all unconfirmed bookings in one place 
    • These are bookings for which the original person they were assigned to didn’t have enough availability. From the Waiting List, you can reassign the booking to someone else, or to a different time, all in one smooth flow
  • You can access info on all the clash and overbooking warnings directly on the Schedule in the actions drawer 
    • You can then simply click to go to the booking that needs addressing. This cuts out a huge amount of time you could spend manually scanning for issues

Using Resource Guru, can I understand how utilized the team are and ensure the workload is distributed fairly?

When it comes to resource scheduling, balancing workloads based on how under- or over-utilized individuals is key. The best resource scheduling software you can use should make these metrics easy to understand and address. Here’s how Resource Guru handles this use case. 

Resource Guru schedule using availability bars and heatmap views gif.

  • The availability bar shows you how much free time each person and resource has along with any overtime or bookings on the Waiting List.
    • You can simply hover over it to get a breakdown of the hours in the day that fall into each of these categories. It’s a super quick way to understand how workloads look for each person and resource on any given day
  • Heatmap views color-code the schedule by availability. You can use these to scan the team’s total utilization, billable utilization, or hours available.
    • This gives you an easy way to understand workloads at a glance
  • The approval workflow lets individuals approve or reject bookings 
    • This acts as a safeguard to make sure in-demand staff don’t end up overburdened. This helps make sure workloads are distributed fairly instead of putting too heavy a workload on any one individual
  • You can also use placeholders to outline work in advance and make distributing it fairly easier

Using Resource Guru, can I make changes on the fly, and at the last minute?

  • The Schedule is flexible by design to facilitate making quick changes and adjustments via smooth drag and drop. Resource Guru users can also use different zoom levels, save views, apply filters, and sort the Schedule in a variety of ways
    • This helps you quickly find the right project, client, person, or resource you need to make changes for and action them right away
    • You can also split bookings directly on the Schedule if you need to distribute the workload efficiently
  • Custom fields let you further categorize projects, clients, bookings, people and resources using any criteria you choose
    • You can filter the Schedule by custom field to find bookings including any criteria you need, making finding the right booking you want to work on easy

For a deeper dive into all these capabilities, check out our dedicated resource scheduling features page.

Overall pros and cons 

Pros

Visibility: Users compliment Resource Guru on how easy it is to see who’s working on what, and adjust accordingly.

G2 logo

“The scheduling interface features a visual layout that allows users to easily view staff availability. The scheduling interface prevents duplicate bookings by showing availability and identifies scheduling conflicts thus saving time.”

– Lionel on G2.

Cons

Limited color customization: Reviews share some feedback about a desire for more color-coding options beyond the existing palette. 

G2 logo

“It would be great to colour-code clients/projects by brand colour rather than the limited colour options currently available.”

– Mark on G2.

What’s next for Resource Guru?

Explore our product portal to see what’s planned next and what we’ve already added. Vote on which features are most important to you and submit new ideas to have your say!

View and Vote on Upcoming Features

2. Harvest Forecast

User reviews

Trial period

Free for 30 days

Pricing

From $5/person/month

Harvest Forecast schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
⚠️ via iCal
Outlook Calendar integration
⚠️ via iCal
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?


Using Harvest Forecast, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • When I tried to overbook someone’s daily availability on Harvest Forecast, the utilzation rate was flagged in red text. In the “Daily availability” view, the schedule also showed a red indicator with “# over” where # was the number of hours overbooked
    • However, there was once again no centralized way to address issues like this, or to find all issues
  • When I tried to book someone on a non-working day, I got a modal to approve this. This is the closest (outside of Resource Guru) I got to being deterred from booking someone on a weekend

Using Harvest Forecast, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Heatmap views make it easy to spot who’s got extra time in their day and whose schedule is full—or over-full 
    • However, they’re only based on hours available unless you swap from daily availability to weekly capacity, so it depends on the timeframe you want to work with

Using Harvest Forecast, can I make changes on the fly, and at the last minute?

  • Harvest Forecast has great drag and drop functionality that makes swapping bookings across days and people’s schedules simple
  • You can also split bookings in a click to divide them between days and manage how the individual’s workload is balanced 

Pros and cons

Pros

Ease of onboarding: Users say it’s easy to get up and running with Harvest Forecast.

G2 logo

“I like the intuitiveness of Forecast as it requires almost no training.”

– Verified user on G2. 

Cons

Limited functionality: Some users report that Harvest Forecast is only really suitable for specific industries. 

G2 logo

“The software is basically for IT projects or software development projects.”

– Saju on G2.

3. Runn

User reviews

Trial period

Free for 14 days

Pricing

From $10/person/month

Runn schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
⚠️ via Zapier
Outlook Calendar integration
⚠️ via Zapier
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?


Using Runn, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • I tried to book someone beyond their set working hours in Runn. But, I only got a red indicator to suggest they were overbooked 
    • There were no other suggestions as to how I could resolve this scheduling conflict
  • Runn handles weekend bookings for folks who don’t work those days better than many options in this article. When setting up a booking for a Saturday, I was notified on hover that this was a non-working day to discourage me from booking there
    • I was made aware of that again when I clicked into that part of the schedule to make a booking. Also, weekends are not visible on the schedule by default, which is great. That set of safeguards is a good way to protect people’s time 

Using Runn, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Runn lets you make bookings based on duration in hours, or by percentage of the working day. This gives you a headstart when it comes to understanding how much people are utilized in a given timeframe 
  • Runn provides charts that overlap the schedule that show the effective capacity of the people you’re scheduling. This lets you see their capacity over time in a highly visual way 
    • However, since it sits at the bottom of the schedule, I found it a bit challenging to rework the schedule with those charts open as there is limited space to work in the UI 

Using Runn, can I make changes on the fly, and at the last minute?

  • Runn is another option with very fluid drag and drop functionality across the schedule. It’s easy to shuffle bookings between different days. That said, I couldn’t drag and drop bookings between different people 
    • However, you can reassign bookings by clicking into the booking and following a few more steps. While that’s not as quick as the process in other options in this list, it’s still possible
  • Runn facilitates resource requests that can help you ask other team members or departments for people you can assign work to
    • While this is practical in terms of finding people with suitable skills, it might not be the most efficient in a time crunch. This is because you’re relying on other people in the organization to respond to your request. And, even if they’re timely about it, they may deny that request

Pros and cons

Pros

Customer support: There’s plenty of praise in reviews for Runn’s customer support team.

“The team are helpful and responsive to feedback.”

– Sam on Capterra.

Cons

Reporting and permissions: Users share that they think reports and permissions are a bit lacking. 

“Some Reports and permission levels are missing or are limited and we’ve had to figure out workarounds.”

– Albert on Capterra.

4. Float

User reviews

Trial period

Free for 30 days

Pricing

From $6/person/month

Float schedule screeshot.

Key features

Feature
Available?
Specific start & end time bookings
✅
People & non-human resource scheduling (e.g., equipment/rooms)
⚠️ Only via placeholders
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
✅
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?


Using Float, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • As with the other examples, I attempted to overbook someone on Float. Unfortunately, the outcome wasn’t very pragmatic. I was able to simply add the hours as overtime 
    • We’ve mentioned this above, but this can make people liable to unproductive overworking in the long run 
  • While the overbooking was flagged on the schedule (the percentage utilization beside the name turned red and displayed a number above 100), I couldn’t find a centralized way to see all the issues
    • On a wider scale, this means you have to scan the schedule for anyone marked as overbooked manually. If you schedule for a large team or organization, this can easily get cumbersome and time consuming
  • When trying to book someone on a non-working day, I had to acknowledge that it was a non-working day to confirm the booking
    • However, this prompts the question as to why these safeguards aren’t in place for overworking on regular working days

Using Float, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Float lets you sort the schedule by what percent utilized people are. 
    • However, this sorting option is set up to prioritize people who are underutilized. That means you can sort the schedule by unscheduled (low → high) and unscheduled (high → low). It’s not as practical for finding folks that are being overutilized or overburdened 
  • That said, Float offers a lot of filtering options within their schedule to help you isolate specific teams, projects, etc., so you can pinpoint groups you want to investigate in terms of utilization 

Using Float, can I make changes on the fly, and at the last minute?

  • They have daily, weekly, and monthly schedule interface options which is a flexible way to organize across different time frames. You can also narrow your scope down to the day when you want to make last-minute changes, so that’s really helpful
  • Float lets you split and link bookings directly on the schedule by right-clicking them

Pros and cons

Pros

Intuitive: Many reviews praise how approachable Float is to use. 

G2 logo

“The UI is user-friendly […] Its implementation was easy and easy to teach the users how to use it and its features.”

– Devkumar on G2.

Cons

Limited features: Some reviewers say they’re lacking essential feature depth on Float. 

G2 logo

“A lot of the functionality is fairly shallow. There aren’t a lot of fields or the option to add custom fields to all users and departments.”

– Verified user on G2. 

5. Toggl Plan

User reviews

Trial period

Free for 30 days

Pricing

From $5/user/month

Toggl Plan schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
⚠️ Using "ghost users"
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
⚠️ Limited to approximately two months of future tasks
Outlook Calendar integration
⚠️ Limited to approximately two months of future tasks
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
❌

Does it solve typical user problems?


Using Toggl Plan, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • When overbooking a person on Toggl Plan, the extra hours got added as overtime. This was flagged on the schedule in red, and the amount of additional hours was labeled clearly
    • However, there was no signposting available as to next steps to mitigate this, or anywhere where all instances of overbooking were centralized
  • When trying to book a weekend when I didn’t specify that the person had weekend availability, I only got a warning when I added the duration to the booking 
    • There was no centralized place I could find to see unworkable weekend bookings other than scanning people’s schedules one-by-one

Using Toggl Plan, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • The “Availability” menu on Toggl Plan can be confusing at first. I noticed the amount of time booked was shown as a percentage of that person’s total availability, but the amount remaining was shown in hours. It could be clearer if both were shown in hours or percentages  

Using Toggl Plan, can I make changes on the fly, and at the last minute?

  • Toggl Plan’s got an effective drag and drop interface and, to add new bookings, you can just press “N” to bring up the right dialogue 
    • One concern is that there’s no “save” button on the booking modal. So, I found it a bit anxiety-inducing to trust that my changes would hold when I finalized all the details 
  • You can right-click on a booking to duplicate it or update its status, directly from the schedule, which is handy for making quick changes

Pros and cons

Pros

Usability: Reviewers praise the simplicity of Toggl Plan. 

G2 logo

“It is easy to use and has a minimal design.”

– Hiten on G2. 

Cons

Multi-resource bookings: Some users express frustration around scheduling multiple people on the same booking. 

G2 logo

“Toggl Plan does not allow multiple assignments to one job or sub-jobs with separate activities. This can be a drawback for complex projects with shared owners.”

– Ankita on G2.

6. Productive

User reviews

Trial period

Free for 14 days

Pricing

From $9/user/month, minimum 3 seats

Productive schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
⚠️ Equipment can only be assigned to people and cannot be scheduled as individual entities
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
⚠️ One-way sync
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?


Using Productive, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • Heatmaps on Productive give a visual overview of who’s got heavy workloads. If someone’s at 100%+ utilization, that day in their calendar turns red. Otherwise, it’s green, or grey if there are tentative bookings, or no bookings
    • But, this was the only indicator I could find for spotting overbooking in the schedule, and there weren’t any signposts on how to proactively resolve those issues
    • Since there’s no centralized place to spot all overbooking issues, this can really slow you down. This is a disadvantage against other options on this list that give you a list of clashes to work through as they arise
  • I was able to book someone for 8 hours on a Saturday even though they weren’t set to be available. This also wasn’t flagged as red in the heatmap 
    • In Productive’s beta “Workload layout” view, you can assign tasks during weekends, but they don’t affect the total hours count for the workload. This may affect the accuracy of time scheduled in the system
    • Productive does flag when you’re trying to book someone during their confirmed time off. It also automatically splits the booking so that the booking can start and end before and after their day(s) off 

Using Productive, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Productive lets you create bookings based on the utilization percentage you want the booking to take up. Conveniently, that means you don’t have to calculate that yourself based on hourly duration
  • Productive has 40+(!) views you can apply to the schedule to understand capacity, utilization, and availability per person
    • But, in my experience, this caused a bit of choice paralysis. Because you can view the schedule in so many different ways, it’s hard to pinpoint which are the most important scheduling metrics
    • On a similar note, Productive isn’t purely built for resource scheduling. So, the tool may be overcomplicated for your needs, and you may not get the best value for money from it as a result 

Using Productive, can I make changes on the fly, and at the last minute?

  • The drag and drop functionality on the Productive schedule was smooth and made it easy to switch bookings between days or people 
  • Splitting bookings was a little confusing. I had to use their help center, but did eventually figure it out
    • You have to click into the booking, then click a meatball menu, then choose “Split”, but the booking then splits at the exact point at which you clicked the booking. This requires serious accuracy to get right on the first try

Pros and cons

Pros

Customer support: Users say Productive’s customer support team is extremely helpful. 

G2 logo

“I feel their support is way above average, as they feel responsive and personal!”

– Harald on G2.

Cons

Learning curve: Some Productive users report a bit of a struggle getting set up with the platform. 

G2 logo

“Productive can be overwhelming at first for its users and the implementation can be rough.”

– Vincent on G2. 

7. Hub Planner

User reviews

Trial period

Free for 14 days

Pricing

From $7/resource/month

HubPlanner schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
⚠️ via Zapier/iCal
Outlook Calendar integration
⚠️ via custom Zapier set up/iCal
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?


Using Hub Planner, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • When I tried to book someone over their typical availability in Hub Planner, I could see that they were over capacity in the schedule, because there was a red “overbooking” line
    • When I clicked that line, the only option to resolve the issue was to extend that person’s availability
  • When I added a booking to a Saturday, I was able to take all the usual steps needed to set it up, and there weren’t any warnings or error messages by default
  • However, after consulting their help center, I learned that you can turn on a scheduling warning system in the settings menu. You can then confirm or reject that you want to overbook that individual, and see how many extra hours you’re booking them for. Only account owners can activate this

Using Hub Planner, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Hub Planner lets you filter the schedule by utilization to spot people who may be overworking or underutilized, which helps with workload management on a macro level
  • HubPlanner’s schedule lets you choose from a variety of timeframes. So, whether you want to see what’s on in the next month or week, it’s easy to get all that info at a glance 
    • However, things can get a bit too compact to scan effectively once you get to the daily view

Using Hub Planner, can I make changes on the fly, and at the last minute?

  • One stand-out feature of Hub Planner is their capacity analyzer. It lets you search people by utilization rate and available hours. This is great if you know you need someone for something very specific at the last minute
  • The drag and drop functionality is very smooth, and it’s easy to swap bookings between projects in a couple of clicks. There’s also a handy duplicate button which makes creating similar bookings easy

Pros and cons

Pros

Ease of use: Hub Planner customers on the whole say the product usability is good. However, some users report an initial learning curve. 

G2 logo

“The interface [is] awkward at first but once I understood how it worked it became very easy to find and add category rows and fill the time columns.”

– Verified user on G2. 

Cons

Data inaccuracy: Some users have cited issues with incorrect information in the schedule. 

G2 logo

“We use the scheduler to schedule hours. However, the schedule is not adjusted retroactively based on: reported time, which means you also have to keep track of the schedule retroactively because otherwise you will no longer know how many hours can be planned. That feels like duplication of work is quite prone to errors.”

– Verified user on G2. 

8. Paymo

User reviews

Trial period

Free for 14 days

Pricing

From $5.90/user/month

Paymo schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
✅
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
❌

Does it solve typical user problems?


Using Paymo, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • Clash warnings show in Paymo when you book someone beyond their capacity, but they’re only available in a small, collapsed menu
    • On the plus side, this section did detail that this booking both went beyond availability and budget, which was a nice addition
  • There was an overbooking indication in red on the schedule once I completed booking this in
    • Despite this, there was no recommended way I could find to immediately take action on that overbooking
  • Weekends are greyed-out on the schedule by default which is a useful indicator to not book time during them. You can also hide weekends on the schedule using the “View” menu
    • However, you can still make weekend bookings, even for people who don’t typically work during them, and you receive no warning that this is inappropriate when you do so

Using Paymo, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • On the Paymo schedule, you can easily see hours remaining based on the team’s availability 
    • However, I could not find a way to configure this to be based on percentage utilization, meaning I would need to do some math on my end to understand capacity
  • In terms of understanding how the workload is distributed, Paymo offers plenty of schedule filters so you can drill down into different views to inspect that
  • One of Paymo’s unique features is its “ghost bookings.” These are predictive bookings that show up based on existing bookings. 
    • I really appreciate these in theory, but found that they can quickly clutter the schedule if you’re making a large amount of bookings or working with a large team. Then, accepting them or removing them becomes more of a chore than a benefit when delegating workloads

Using Paymo, can I make changes on the fly, and at the last minute?

  • Drag and drop on Paymo is snappy. It’s simple to swap bookings around between days and people
  • However, I couldn’t find a way to split bookings 

Pros and cons

Pros

User interface: Users compliment how easy it is to get an overview of work on Paymo.

G2 logo

“Get a bird’s-eye view of your team’s schedule.”

– Khalid on G2.  

Cons 

Customer support: There is some criticism of Paymo’s customer support on popular review sites. 

G2 logo

“When you reach out to support to get to know more about their future plans, there’s no helpful response nor alternatives or workaround provided, which is kind of a disappointment.”

– Verified user on G2.

9. Streamtime

User reviews 

Trial period

Free for 30 days

Pricing 

Available on request. In their example price listings, they say an 80 employee, 35 freelancer branding and design agency pays £45,000/year.

Streamtime schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
❌
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
⚠️ via Zapier
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
❌

Does it solve typical user problems?


Using Streamtime, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • When I booked a person beyond their default availability, a red line appeared on the Streamtime schedule, but there was no tooltip or instructions to clarify why it was there or what it was for
    • Even when I clicked on this warning indication, nothing happened, so I found it hard to know what was causing the issue 
    • I couldn’t find a way to view all schedule conflicts, or any signposts on how to resolve them
  • When I booked someone over a weekend, I didn’t receive a warning. However, there was a pre-selected checkbox present labelled “include non-working days” while I was making the booking
    • This may make staff more liable to being booked on days they’re not supposed to be, causing issues with individual capacity and overall project forecasting 

Using Streamtime, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • You can view “jobs” and “to-dos” by percentage utilization, making it easy to scan the schedule to understand individual availability
    • One issue here is that the terminology on Streamtime is a bit confusing. “To-dos”, “jobs” and “tasks” are all quite synonymous, so it was hard for me to initially understand the difference
  • I found the schedule itself can come across a little monotone with its minimalist color pallet, so it’s less straightforward than other solutions on this list if you want to scan how projects are distributed among the team 

Using Streamtime, can I make changes on the fly, and at the last minute?

  • Streamtime’s drag and drop interface offers a straightforward way to shift bookings between days and people’s schedules
  • Any changes made in the schedule are also reflected in those individuals’ “to-do lists”

Pros and cons 

Pros 

Easy integration with design tools: Users say Streamtime connects nicely with other design tools in their stack, mirroring the fact that they’ve built the platform for creatives.

G2 logo

“Streamtime happily coexists with popular design tools to avoid distraction and, therefore, help improve our design flow.”

– Linh on G2

Cons 

Learning curve: Other reviews say finding the information they need in Streamtime can prove difficult. 

G2 logo

“The reinvention of how resourcing typically works means that those on our team who are experienced in project management still have to re-learn everything from scratch.”

– Steve on G2

10. Everhour

User reviews

Trial period

Free for 14 days

Pricing

From $8.50/seat/month, minimum 5 seats

Everhour schedule screenshot.

Key features

Feature
Available?
Specific start & end time bookings
⚠️ Only for shift durations
People & non-human resource scheduling (e.g., equipment/rooms)
❌
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
✅
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
❌

Does it solve typical user problems?


Using Everhour, can I understand what everyone’s workload is like and avoid
overbooking or causing schedule conflicts?

  • It was too easy, in my opinion, to overbook people. I booked someone for 16 hours on an 8 hour work day and received no warnings, either during set up or on the schedule
    • What’s more, I tried to push this to see if a more drastic overbooking would signal an issue. Unfortunately, I was able to book someone for 25 hours in a day, one of which doesn’t exist 
    • Everhour’s default working hours per individual are 9am – 7pm—quite the hefty work day! This is also customizable, however, so you can set a good baseline for working hours
  • Booking on the weekend was more reassuring as I had to actively consent to booking a Saturday to get the booking to save
  • Overall, the Everhour is tailored towards shift work, which may not work for all business models

Using Everhour, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Everhour offers a variety of ways to view the schedule to see how workloads are distributed. You can drill down into the schedule based on members, clients, and projects. That way, depending on what your priorities are, you can find out how work is progressing

Using Everhour, can I make changes on the fly, and at the last minute?

  • The drag and drop functionality on Everhour makes it simple to swap a person’s bookings between different days
    • However, it didn’t behave in the same way for me when I wanted to drag and drop a booking between different people’s calendars 
    • I also couldn’t find a way to split bookings into multiple bookings, even after consulting their help center

Pros and cons

Pros

Simplicity: Users generally find it easy to get started with this solution.

G2 logo

“I like how simple Everhour is to get set up with.”

– Erica on G2.

Cons

Customer support: Some users say Everhour’s quality of support could be improved. 

G2 logo

“Their support is slow to respond and half the time their answers make no sense.”

– Ben on G2. 

11. Teambook

User reviews

Trial period

30-day free trial available (no credit card required)

Pricing

From $3/month (pricing based on number of projects with unlimited users)

Key features

Feature
Available?
Specific start & end time bookings
✅
People & non-human resource scheduling (e.g., equipment/rooms)
✅
Visual calendar or timeline view
✅
Drag-and-drop rescheduling
✅
Workload/
availability view
✅
Recurring bookings
✅
Leave/absence tracking
✅
Google Calendar integration
✅
Outlook Calendar integration
✅
Mobile access/
responsiveness
✅
Heatmap view (Resource utilization by color)
✅

Does it solve typical user problems?

Using Teambook, can I understand what everyone’s workload is like and avoid overbooking or causing schedule conflicts?

  • Teambook provides color-coded visual blocks that make it easy to quickly scan the schedule and identify who’s working on what
    • The visual planning board shows team availability at a glance, helping you spot potential conflicts before they occur
  • When viewing the schedule, you can see workload distribution across team members with utilization indicators
    • However, there’s no centralized clash management system to proactively warn you about overbooking or help resolve conflicts in one place
  • The platform does flag weekends and non-working days visually, which helps prevent accidental bookings during time off

Using Teambook, can I understand how utilized the team are and ensure the workload is distributed fairly?

  • Teambook’s capacity planning module lets you view resource utilization rates over 6 to 24 months, making it easier to anticipate over- or under-capacity
    • This forward-looking view helps with strategic planning around hiring or resource reallocation
  • The visual planner uses color coding to show who’s busy and who’s available, allowing you to balance workloads effectively
    • You can filter and sort the schedule using tags to identify team members by skills, ensuring work is distributed to the right people
  • The platform tracks billable hours, helping you understand not just who’s busy, but whether that time is being used productively on revenue-generating work

Using Teambook, can I make changes on the fly, and at the last minute?

  • Teambook’s drag-and-drop interface makes it simple to reschedule bookings quickly by moving them between days or reassigning to different team members
  • Tentative bookings allow you to plan uncertain work and confirm it later, giving you flexibility when project details are still being finalized
  • You can use bulk edit features to make changes to multiple bookings at once, which is helpful when you need to shift several tasks simultaneously
    • The recurring booking feature also saves time for regular meetings or ongoing work

Overall pros and cons

Pros

Calendar integration: The seamless sync with Google Calendar and Outlook is frequently highlighted as a major benefit.

“I really like calendar integration and Planner filters. We were previously using Excel sheets to plan and now Planning become much more efficient and painless with Teambook.”

– Frank on Capterra.

Cons

Mobile experience: Several reviewers mention that the mobile interface could be improved.

“The main weak point of the software maybe structural (in the sense that I don’t know if there is a solution for that), it concerns the way it shows on mobile phones. It is no easy to scroll and have a good overview.”

– Nina on Capterra.

How to choose the best resource scheduling software for you

Ultimately, the best resource scheduling software for you heavily depends on your individual business needs. However, if you want a solution with pragmatic ways to protect people’s valuable time, clear visibility over workloads, and the flexibility you need to make changes at the last minute and beyond, Resource Guru’s a safe bet. 

Even better, you can try it free for 14 days to see for yourself. Claim your trial here: 

The #1 scheduling and time tracking tool trusted by thousands of project teams

Join thousands of project managers who have made scheduling a breeze.

Free Trial Talk to Sales

A note on the details

I’ve made every effort to make sure the information included in this evaluation is accurate at time of writing, including prices. Of course, I only had limited time to test out each solution. As such, I may have missed some things. There may be functionality or workarounds I didn’t uncover within that window that may be omitted.

Last update: September 2026

Maria Keenan

👋 Hi. I’m Maria. I write for Resource Guru to help make your work days—and days off—better. I’m always open to suggestions for topics we should cover, so please send yours to happytohelp@resourceguru.com