{"id":4083,"date":"2026-11-10T13:53:51","date_gmt":"2026-11-10T13:53:51","guid":{"rendered":"https:\/\/resourceguruapp.com\/blog\/?p=4083"},"modified":"2026-11-10T14:23:49","modified_gmt":"2026-11-10T14:23:49","slug":"project-life-cycle","status":"publish","type":"post","link":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle","title":{"rendered":"Project life cycle: The 5 phases, types, and examples"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The project life cycle is the series of phases a project passes through, from the first idea to final handover. This project management life cycle consists of five main phases: initiation, planning, execution, monitoring and controlling, and closure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This article will cover what\u2019s involved at each stage and how to transition from one to another smoothly. First, though, some context.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This guide is for project managers, studio managers, operations leads, and resource managers. It covers each phase, the gate that closes it, and how to handle capacity shifts along the way.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The main problem a healthy project life cycle solves is project slippage. Typically, unrealistic deadlines get set long before the work starts, so it\u2019s important that every step of the life cycle is a well-oiled machine. Just look at data from <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/resource-management\/the-state-of-overworking-2025\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">The State of (Over)working 2025<\/span><\/a><span style=\"font-weight: 400;\">, and you\u2019ll see 33% of UK desk workers who ended up with burnout blamed deadlines like this.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This article aims to cut that issue off at the source with practical ways to ensure each phase of each project not only protects its profitability, but the people delivering it.<\/span><\/p>\n<h2><b>The project life cycle, at a glance<\/b><\/h2>\n<div class=\"callout callout--takeaway\">\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project life cycle is the series of phases a project moves through, from first idea to final handover<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Most guides (including ours) recommend five phases: initiation, planning, execution, monitoring and controlling, and closure<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Each phase ends at a gate, a sign-off that helps you decide whether the project is ready to move on to the next phase<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Resource and capacity needs peak in execution, so we recommend planning capacity by phase before each one starts<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Choose the life cycle type by how clear your scope is. We include multiple examples and use cases for your convenience<\/span><\/li>\n<\/ul>\n<\/div>\n<div class=\"expert expert--default\"><div class=\"expert__text\"><h4><strong>Expert input: Yad Senapathy<\/strong><\/h4>\n<p>For this article, we spoke with Yad, a project management veteran (and self-styled PMP Jedi Master), to understand his approach to the project life cycle. Here&#8217;s a little more about him:<\/p>\n<p>Yad Senapathy, MS, PMP, is the Founder and CEO of the Project Management Training Institute (PMTI), North America\u2019s leading PMP certification boot camp, which he co-founded in Dallas, Texas, in 2003.<\/p>\n<p>Over more than two decades, PMTI has trained over 80,000 professionals to earn their PMP certification, maintaining a 99% exam pass rate. Enterprise clients include Amazon, General Dynamics, Booz Allen Hamilton, Adobe, Genentech, L3Harris, and the U.S. Air Force.<\/p>\n<\/div><div class=\"expert__links\"><ul><li class=\"expert__links__linkedin\"><a href=\"https:\/\/www.linkedin.com\/in\/yadsenapathy\" target=\"_blank\">Follow Yad on LinkedIn<\/a><\/li><\/ul><\/div><\/div>\n<h2><b>What is a project life cycle?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">To understand what &#8220;project life cycle&#8221; means, it&#8217;s important to be familiar with a few related concepts.<\/span><\/p>\n<p>As we mentioned at the start, the project life cycle is the series of phases a project moves through from start to finish.<\/p>\n<p><span style=\"font-weight: 400;\">We define a project itself as a temporary effort to create a unique product, service, or result, which means it always has an end and phases in between.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project <em>management<\/em> life cycle, specifically, describes how you manage that journey, from the first idea to final handover.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Most project life cycles share six traits:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A defined start and finish<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Objectives set at the beginning<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A plan for reaching them<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Deliverables and tasks to complete<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A way of managing the work<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A list of stakeholders<\/span><\/li>\n<\/ol>\n<p>In the following sections we&#8217;ll break the cycle down into its distinct phases and then dig into each in detail.<\/p>\n<h2><b>The phases of a project life cycle<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The project life cycle has five phases, and each one ends at a \u201cgate\u201d. The diagram below shows the order, and the sections after it cover what happens in each phase, what you deliver, and what decisions happen at each particular gate. The table at the end of this section sums it all up.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4087 size-medium\" src=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle-943x583.png\" alt=\"The five phases of the project life cycle: initiation, planning, execution, monitoring and controlling, and closure.\" width=\"943\" height=\"583\" srcset=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle-943x583.png.webp 943w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle-1042x645.png.webp 1042w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle-1536x950.png 1536w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle.png 1912w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/5-phases-of-project-life-cycle-943x583@2x.png.webp 1886w\" sizes=\"auto, (max-width: 943px) 100vw, 943px\" \/><\/p>\n<h3><b>Phase 1: Initiation<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The initiation phase is where an idea gets turned into an approved project. Ideally, in this phase, you write the project charter, which sets objectives and scope, and you list the stakeholders. You should also test feasibility and build the business case, weighing benefits, costs, and risks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our guide to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-initiation\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">project initiation<\/span><\/a><span style=\"font-weight: 400;\"> has the full checklist, and our guide to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-team-roles-and-responsibilities\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">roles and responsibilities<\/span><\/a><span style=\"font-weight: 400;\"> can help you decide who does what.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some additional steps that can help in this phase are creating a rough demand forecast and performing a skills check. These involve figuring out how many people the project will this need, and whether everyone has the necessary skills or experience. Answering those questions at this stage stops you from promising work you can&#8217;t staff adequately.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key deliverable in initiation is a signed project charter. The exit gate is sponsor sign-off. In a 60-person agency, the sponsor is often a founder or director. In a larger organization, it might be a COO.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">PMI&#8217;s <\/span><a href=\"https:\/\/www.pmi.org\/about\/press-media\/2026\/pulse-why-complex-projects-fail-best-practices-are-not-enough-system-thinking\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Pulse of the Profession 2026<\/span><\/a><span style=\"font-weight: 400;\"> lists sponsor alignment at initiation among the practices high performers use more than low performers. PMI reports that 39% of high performers use it, against 30% of low performers.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here\u2019s a first-hand recommendation too:\u00a0<\/span><\/p>\n<div class=\"quote quote--image quote--green\"><div class=\"quote__text\"><p>&#8220;Ensure project scope, success criteria (including what is not in scope), key project dependencies, budget (agreed with the sponsor), and authority to make changes are all agreed before commencing work on a project. It is important to define success and agreement upfront.&#8221;<\/p>\n<\/div><div class=\"quote__author\"><div class=\"quote__author__image\"><img loading=\"lazy\" decoding=\"async\" width=\"105\" height=\"105\" src=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-105x105.png.webp\" class=\"attachment-quote size-quote wp-post-image\" alt=\"Yad Senapathy headshot.\" srcset=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-105x105.png.webp 105w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-671x671.png.webp 671w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-711x711.png.webp 711w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-1536x1536.png.webp 1536w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-44x44.png.webp 44w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-310x310.png.webp 310w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-800x800.png 800w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-1200x1200.png 1200w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture.png 1728w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-105x105@2x.png.webp 210w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-671x671@2x.png.webp 1342w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-711x711@2x.png.webp 1422w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-44x44@2x.png.webp 88w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2026\/11\/Yad-bust-picture-310x310@2x.png.webp 620w\" sizes=\"auto, (max-width: 105px) 100vw, 105px\" \/><\/div><div class=\"quote__author__cite\"><cite><p><strong>Yad Senapathy<\/strong> <span>Founder & CEO<\/span> <span>Project Management Training Institute<\/span><\/p><\/cite><\/div><\/div><\/div>\n<h3><b>Phase 2: Planning<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Project planning is the second phase of the project life cycle. It sets the baseline that every later phase is measured against. A solid project plan covers:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Scope, objectives, and deliverables<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Schedule and dependencies<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Budget<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Risk plan<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Communication plan<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Quality plan<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This description is intentionally high-level because there are many different approaches. However, our step-by-step guide to creating a <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/create-a-project-plan\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">project plan<\/span><\/a><span style=\"font-weight: 400;\"> goes deeper, and a free <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/free-project-plan-template-for-excel\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">project plan template<\/span><\/a><span style=\"font-weight: 400;\"> can offer you a solid start.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Resourcing in this phase means building the capacity plan, which should include who specifically is available, with which skills, across the weeks the plan covers. <a href=\"https:\/\/resourceguruapp.com\/blog\/resource-management\/resource-allocation-guide\" target=\"_blank\" rel=\"noopener\">Resource allocation<\/a><\/span><span style=\"font-weight: 400;\">, which puts named people on tasks, is just one component of that work.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key deliverable at the end of this phase is the approved project plan. The exit gate is stakeholder approval.<\/span><\/p>\n<h3><b>Phase 3: Execution<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Execution is where most of the <\/span><i><span style=\"font-weight: 400;\">actual<\/span><\/i><span style=\"font-weight: 400;\"> work gets done i.e., where the team produces the deliverables. The project manager briefs people, coordinates the schedule, and keeps the client or internal stakeholders informed through regular reviews. Our guide to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-execution\"><span style=\"font-weight: 400;\">project execution<\/span><\/a><span style=\"font-weight: 400;\"> covers the day-to-day and is helpful if you\u2019re looking for a more thorough walkthrough than we can fit in this section.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is also the stage where resource demand peaks. Most of the billable hours and most of the clashes happen here. A deadline that made sense in the plan gets tested the first time someone is out sick or a client review overruns.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Delivery data shows how often that causes knock-on effects. In <\/span><a href=\"https:\/\/wellingtone.co.uk\/publications\/state-of-project-management-research\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Wellingtone&#8217;s State of Project Management 2026 report<\/span><\/a><span style=\"font-weight: 400;\">, only 36% of organizations mostly or always complete projects on time.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key deliverable of this phase is the finished work, ready for review. The exit gate is the client or sponsor accepting the deliverables.<\/span><\/p>\n<h3><b>Phase 4: Monitoring and controlling<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The monitoring and controlling phase runs alongside execution. During it, you track budget, <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/resource-management\/resource-utilization\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">utilization<\/span><\/a><span style=\"font-weight: 400;\">, and scope against their baselines, then course-correct if you spot any issues.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our guide to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-monitoring-and-control\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">monitoring and control<\/span><\/a><span style=\"font-weight: 400;\"> covers the metrics you should keep an eye on in detail, though you should always reference the specific metrics\/KPIs agreed at the start of each project. At this stage, you should also factor in the time needed for reporting on all the above. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">For reference, per <\/span><a href=\"https:\/\/wellingtone.co.uk\/publications\/state-of-project-management-research\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Wellingtone&#8217;s 2026 report<\/span><\/a><span style=\"font-weight: 400;\">, 72% of project professionals said they spend half a day or more each month collating reports.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As you progress, you will also liaise with your client or other stakeholders, and may have to deal with additional requests. At this point it\u2019s important to check and reference the <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/what-is-project-scope\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">agreed project scope<\/span><\/a><span style=\"font-weight: 400;\">. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">One small change is fine if you log it and approve it but a string of them can lead to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/scope-creep\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">scope creep,<\/span><\/a><span style=\"font-weight: 400;\"> which can cause massive delays if left unresolved. When a change is necessary, make sure to update the baseline and the schedule together so the plan stays accurate.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key deliverables at this stage are variance reports and approved change requests. The exit gate is passed once variances are back within tolerance, or stakeholders approve a new baseline.<\/span><\/p>\n<h3><b>Phase 5: Closure<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Project closure involves handing the work over and getting the team ready to start on their next project. Therein, you typically deliver final documents and deliverables, close contracts, release people back to work on new initiatives, and run a lessons-learned review. Our guide to <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-closure\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">project closure<\/span><\/a><span style=\"font-weight: 400;\"> and <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-closure-checklist\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">closure checklist<\/span><\/a><span style=\"font-weight: 400;\"> cover each step.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">One important tip for this phase: Record <\/span><i><span style=\"font-weight: 400;\">actual<\/span><\/i><span style=\"font-weight: 400;\"> hours before everyone moves on to the next project. In <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/resource-management\/the-state-of-overworking-2025\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">The State of (Over)working 2025<\/span><\/a><span style=\"font-weight: 400;\">, 46% of desk workers said they don&#8217;t use any timesheet software but, without actuals, your next project estimate is just conjecture, and is far less likely to be accurate.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With real actuals from timesheet entries, you estimate from data. That gives you the confidence you need to defend your recommended timeline, and to request any additional people or resources to get the work over the line.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key deliverables at this stage are the handover pack and the lessons-learned report. The exit gate is formal sign-off.<\/span><\/p>\n<h3><b>Project life cycle deliverables and phase gates<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Use this table as a checklist for the product of each phase, and what has to be true before you and your team can move on to the next phase.<\/span><\/p>\n<div class=\"ntb_table_wrapper ninja_table_builder_instance_0\"\n     id='ninja_table_builder_10318'\n     data-ninja_table_builder_instance=\"ninja_table_builder_instance_0\"\n     style=\"\n     max-height:1000px;\n     max-width: 1160px;\">\n    <table id=\"ntb_table\" role=\"table\" class=\"table ninja_tables_builder_class_10318 ntb_10318\" style=\"margin: 0px auto; table-layout: fixed; border-collapse: collapse; border: 0px solid rgb(0, 0, 0); font-family: inherit; border-spacing: 0px;\"><tbody class=\"tbody\"><tr class=\"desktop-view tr_class_9428401\" id=\"tr_id_9428401\" data-draggable=\"true\" style=\"background: rgb(234, 204, 242);\"><td id=\"td_id_39916202\" class=\"td_class_39916202 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"2\"><div id=\"cell_39916202\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_0\" spellcheck=\"false\"><strong>Phase<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_35160818\" class=\"td_class_35160818 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"3\"><div id=\"cell_35160818\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_1\" spellcheck=\"false\"><strong>Key deliverables<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_74275890\" class=\"td_class_74275890 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"4\"><div id=\"cell_74275890\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_2\" spellcheck=\"false\"><strong>Exit gate<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_75852151\" class=\"td_class_75852151 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"5\"><div id=\"cell_75852151\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_3\" spellcheck=\"false\"><strong>Resourcing decision<\/strong><\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_9399122\" id=\"tr_id_9399122\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_20319811\" class=\"td_class_20319811 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"7\"><div id=\"cell_20319811\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_4\" spellcheck=\"false\"><em>Initiation<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_29369880\" class=\"td_class_29369880 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"8\"><div id=\"cell_29369880\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_5\" spellcheck=\"false\">Project charter, business case, stakeholder list<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_84046418\" class=\"td_class_84046418 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"9\"><div id=\"cell_84046418\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_6\" spellcheck=\"false\">Sponsor signs off the project charter<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_72115364\" class=\"td_class_72115364 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"10\"><div id=\"cell_72115364\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_7\" spellcheck=\"false\">Rough demand forecast and skills check<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_2572244\" id=\"tr_id_2572244\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_41597371\" class=\"td_class_41597371 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"12\"><div id=\"cell_41597371\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_8\" spellcheck=\"false\"><em>Planning<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_93667999\" class=\"td_class_93667999 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"13\"><div id=\"cell_93667999\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_9\" spellcheck=\"false\">Project plan, schedule, budget, risk plan, communication plan, quality plan<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_69651222\" class=\"td_class_69651222 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"14\"><div id=\"cell_69651222\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_10\" spellcheck=\"false\">Stakeholders approve the baseline<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_65979641\" class=\"td_class_65979641 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"15\"><div id=\"cell_65979641\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_11\" spellcheck=\"false\">Capacity plan built, then named people allocated<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_6619344\" id=\"tr_id_6619344\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\" draggable=\"false\"><td id=\"td_id_41144526\" class=\"td_class_41144526 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"17\"><div id=\"cell_41144526\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_12\" spellcheck=\"false\"><em>Execution<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_20171699\" class=\"td_class_20171699 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"18\"><div id=\"cell_20171699\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_13\" spellcheck=\"false\">Finished deliverables, status reports, client review notes<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_99736068\" class=\"td_class_99736068 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"19\"><div id=\"cell_99736068\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_14\" spellcheck=\"false\">Client or sponsor accepts the deliverables<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_58641271\" class=\"td_class_58641271 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"20\"><div id=\"cell_58641271\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_15\" spellcheck=\"false\">Utilization tracked and work rebalanced as it changes<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_6129948\" id=\"tr_id_6129948\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_29549223\" class=\"td_class_29549223 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"22\"><div id=\"cell_29549223\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_16\" spellcheck=\"false\"><em>Monitoring and controlling<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_80696885\" class=\"td_class_80696885 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"23\"><div id=\"cell_80696885\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_17\" spellcheck=\"false\">Variance reports, approved change requests<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_69655421\" class=\"td_class_69655421 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"24\"><div id=\"cell_69655421\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_18\" spellcheck=\"false\">Variances back within tolerance, or a new baseline approved<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_97545600\" class=\"td_class_97545600 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"25\"><div id=\"cell_97545600\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_19\" spellcheck=\"false\">Work reallocated when variance appears<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_6835949\" id=\"tr_id_6835949\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_66191010\" class=\"td_class_66191010 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"27\"><div id=\"cell_66191010\"><div class=\"single-item item-active other-item is-editing\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_20\" spellcheck=\"false\"><em>Closure<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_92741610\" class=\"td_class_92741610 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"28\"><div id=\"cell_92741610\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_21\" spellcheck=\"false\">Handover pack, closed contracts, lessons-learned report<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_64077902\" class=\"td_class_64077902 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"29\"><div id=\"cell_64077902\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_22\" spellcheck=\"false\">Delivery lead and sponsor sign off, and the project is archived<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_45484411\" class=\"td_class_45484411 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"30\"><div id=\"cell_45484411\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_23\" spellcheck=\"false\">People released back to the schedule and actual hours recorded<\/span><\/div><\/div><\/div><\/td><\/tr><\/tbody><\/table><\/div>\n\n<h2><b>How resource and capacity needs change across the project life cycle<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Whatever project lifecycle management software you use, someone has to answer one question before every phase: do we have the people? To get a good answer, you should consider <\/span><b>capacity by phase<\/b><span style=\"font-weight: 400;\">. Capacity by phase just means baking <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/capacity-planning-guide\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">capacity planning<\/span><\/a><span style=\"font-weight: 400;\"> into each stage. To do that, you forecast the people and skills a phase needs, then check that against who&#8217;s available before it starts.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here is how capacity by phase plays out:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Initiation.<\/b><span style=\"font-weight: 400;\"> Make a rough demand forecast and a skills check\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Planning.<\/b><span style=\"font-weight: 400;\"> Build the capacity plan, then allocate named people<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Execution.<\/b><span style=\"font-weight: 400;\"> Track utilization and <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/workload-planning-guide\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">rebalance workloads<\/span><\/a><span style=\"font-weight: 400;\"> as work shifts<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Monitoring and controlling.<\/b><span style=\"font-weight: 400;\"> Reallocate as soon as variance appears<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Closure. <\/b><span style=\"font-weight: 400;\">Record capacity lessons, such as what the project really took and where capacity ran short.<\/span><\/li>\n<\/ul>\n<div class=\"quote quote--default quote--green\"><div class=\"quote__text\"><p>&#8220;Resource problems happen when you&#8217;ve scheduled the same specialist to work on multiple projects around the same time. Checking their availability, when you need their involvement and if other teams\/projects need their expertise can highlight issues early on.&#8221;<\/p>\n<\/div><div class=\"quote__author\"><div class=\"quote__author__cite\"><cite><p><strong>Yad Senapathy<\/strong> <span>Founder and CEO<\/span> <span>Project Management Training Institute<\/span><\/p><\/cite><\/div><\/div><\/div>\n<p><span style=\"font-weight: 400;\">Running several teams or offices? Add up capacity by phase across every active project, and you can see where the same people are wanted twice, long before clashes land.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Resource Guru&#8217;s <\/span><a href=\"https:\/\/resourceguruapp.com\/features\/capacity-planning-software\"><span style=\"font-weight: 400;\">capacity planning software<\/span><\/a><span style=\"font-weight: 400;\"> shows who&#8217;s over- or under-utilized, lets you map unconfirmed work against tentative bookings and placeholders, and flags clashes.<\/span><\/p>\n<div class=\"freetrial freetrial--text-light freetrial--default\"><div class=\"freetrial__image\"><img loading=\"lazy\" decoding=\"async\" width=\"310\" height=\"218\" src=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial-310x218.png\" class=\"attachment-freetrial size-freetrial wp-post-image\" alt=\"Screenshot of Resource Guru&#039;s resource scheduling platform.\" srcset=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial-310x218.png 310w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial.png 708w\" sizes=\"auto, (max-width: 310px) 100vw, 310px\" \/><\/div><div class=\"freetrial__text\"><h4>The #1 scheduling tool trusted by thousands of project teams<\/h4>\n<p>Join thousands of project managers who have made scheduling a breeze.<\/p>\n<p><a class=\"button\" href=\"https:\/\/app.resourceguruapp.com\" target=\"_blank\" rel=\"noopener\">Free Trial<\/a> <a class=\"button button--outline\" href=\"https:\/\/resourceguruapp.com\/contact-sales\" target=\"_blank\" rel=\"noopener\">Talk to Sales<\/a><\/p>\n<\/div><\/div>\n<h2><b>Types of project life cycles<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The five phases are the same across projects, but you can run those phases in different ways, and each way is a project life cycle type. Choosing between them generally depends on how clear your scope is. Check out the table below for which type suits which level of scope clarity you\u2019re dealing with.<\/span><\/p>\n<div class=\"ntb_table_wrapper ninja_table_builder_instance_1\"\n     id='ninja_table_builder_10320'\n     data-ninja_table_builder_instance=\"ninja_table_builder_instance_1\"\n     style=\"\n     max-height:1000px;\n     max-width: 1160px;\">\n    <table id=\"ntb_table\" role=\"table\" class=\"table ninja_tables_builder_class_10320 ntb_10320\" style=\"margin: 0px auto; table-layout: fixed; border-collapse: collapse; border: 0px solid rgb(0, 0, 0); font-family: inherit; border-spacing: 0px;\"><tbody class=\"tbody\"><tr class=\"desktop-view tr_class_3406685\" id=\"tr_id_3406685\" data-draggable=\"true\" style=\"background: rgb(234, 204, 242);\"><td id=\"td_id_42191610\" class=\"td_class_42191610 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"2\"><div id=\"cell_42191610\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_0\" spellcheck=\"false\"><strong>Type<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_66253322\" class=\"td_class_66253322 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"3\"><div id=\"cell_66253322\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_1\" spellcheck=\"false\"><strong>How the phases run<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_34865555\" class=\"td_class_34865555 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"4\"><div id=\"cell_34865555\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_2\" spellcheck=\"false\"><strong>Best when<\/strong><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_71245359\" class=\"td_class_71245359 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"5\"><div id=\"cell_71245359\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_3\" spellcheck=\"false\"><strong>Example<\/strong><\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_8066316\" id=\"tr_id_8066316\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_20806143\" class=\"td_class_20806143 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"7\"><div id=\"cell_20806143\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_4\" spellcheck=\"false\"><em>Predictive (waterfall)<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_66100753\" class=\"td_class_66100753 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"8\"><div id=\"cell_66100753\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_5\" spellcheck=\"false\">You plan everything first, then run each phase once, in order<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_50726250\" class=\"td_class_50726250 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"9\"><div id=\"cell_50726250\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_6\" spellcheck=\"false\">Scope, schedule, and cost are fixed and well understood<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_24509375\" class=\"td_class_24509375 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"10\"><div id=\"cell_24509375\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_7\" spellcheck=\"false\">A building fit-out or an offshore wind design package, where design is approved before construction starts<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_5016574\" id=\"tr_id_5016574\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_86539238\" class=\"td_class_86539238 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"12\"><div id=\"cell_86539238\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_8\" spellcheck=\"false\"><em>Iterative<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_66174106\" class=\"td_class_66174106 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"13\"><div id=\"cell_66174106\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_9\" spellcheck=\"false\">Phases repeat, and feedback after each round reshapes the next<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_34272474\" class=\"td_class_34272474 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"14\"><div id=\"cell_34272474\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_10\" spellcheck=\"false\">The goal is clear but the solution is not<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_19163990\" class=\"td_class_19163990 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"15\"><div id=\"cell_19163990\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_11\" spellcheck=\"false\">A consultancy's process redesign, where each workshop's findings shape the next round<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_3222868\" id=\"tr_id_3222868\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_16344214\" class=\"td_class_16344214 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"17\"><div id=\"cell_16344214\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_12\" spellcheck=\"false\"><em>Incremental<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_57387328\" class=\"td_class_57387328 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"18\"><div id=\"cell_57387328\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_13\" spellcheck=\"false\">The project ships in sets, and each set runs through the phases in order<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_71517856\" class=\"td_class_71517856 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"19\"><div id=\"cell_71517856\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_14\" spellcheck=\"false\">Value can be delivered in usable pieces and delivery timing matters<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_19143936\" class=\"td_class_19143936 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"20\"><div id=\"cell_19143936\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_15\" spellcheck=\"false\">A software integration released module by module<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_6059946\" id=\"tr_id_6059946\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\"><td id=\"td_id_19837870\" class=\"td_class_19837870 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"22\"><div id=\"cell_19837870\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_16\" spellcheck=\"false\"><em>Agile (adaptive)<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_17272620\" class=\"td_class_17272620 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"23\"><div id=\"cell_17272620\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_17\" spellcheck=\"false\">Initiation happens once, then planning, execution, and control repeat in short cycles with feedback<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_45954254\" class=\"td_class_45954254 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"24\"><div id=\"cell_45954254\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_18\" spellcheck=\"false\">Scope is unclear, feedback is essential, and requirements will change<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_18041021\" class=\"td_class_18041021 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"25\"><div id=\"cell_18041021\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_19\" spellcheck=\"false\">Creative production in two-week sprints<\/span><\/div><\/div><\/div><\/td><\/tr><tr class=\"desktop-view tr_class_9901112\" id=\"tr_id_9901112\" data-draggable=\"true\" style=\"background: rgb(255, 255, 255);\" draggable=\"false\"><td id=\"td_id_86583107\" class=\"td_class_86583107 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"27\"><div id=\"cell_86583107\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_20\" spellcheck=\"false\"><em>Hybrid<\/em><\/span><\/div><\/div><\/div><\/td><td id=\"td_id_79096146\" class=\"td_class_79096146 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"28\"><div id=\"cell_79096146\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_21\" spellcheck=\"false\">Predictive where scope is fixed, adaptive where it is still forming<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_14336366\" class=\"td_class_14336366 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"29\"><div id=\"cell_14336366\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_22\" spellcheck=\"false\">Part of the work has fixed constraints and part needs flexibility<\/span><\/div><\/div><\/div><\/td><td id=\"td_id_83338893\" class=\"td_class_83338893 table-data\" rowspan=\"1\" colspan=\"1\" style=\"padding: 10px; max-width: 150px; min-width: 150px; border: 1px solid rgb(0, 0, 0);\" cellindex=\"30\"><div id=\"cell_83338893\"><div class=\"single-item other-item\" data-draggable=\"true\" draggable=\"false\"><div class=\"ntb-datas-wrapper\" style=\"margin: 1px;\"><span data-v-6990c455=\"\" data-placeholder=\"Add New\" class=\"hover-item\" style=\"padding: 0px; font-weight: normal; font-style: normal; text-decoration: none; font-size: 15px; display: block; text-align: center; color: rgb(0, 0, 1); opacity: 1; line-height: 1.2;\" id=\"mce_23\" spellcheck=\"false\">A multi-channel campaign with a fixed launch date and sprint-based asset production<\/span><\/div><\/div><\/div><\/td><\/tr><\/tbody><\/table><\/div>\n\n<p><span style=\"font-weight: 400;\">A hybrid life cycle combines predictive and adaptive approaches in one project. The parts with fixed scope, dates, or budgets follow a predictive plan, and the parts where requirements are still forming run in short iterations. Our <a href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-methodologies\" target=\"_blank\" rel=\"noopener\">guide to project methodologies <\/a><\/span><span style=\"font-weight: 400;\">covers each approach in more depth.<\/span><\/p>\n<h2><b>Project life cycle example: A multi-channel agency campaign<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">All the details we\u2019ve covered up until now are as practical as possible, but it can often help to see a worked example of the project life cycle to make the whole process easier to understand. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">For this one, imagine a 90-person agency running a multi-channel launch campaign for a client on retainer. We\u2019ll use the hybrid life cycle: predictive at each end, agile in the middle.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Initiation.<\/b><span style=\"font-weight: 400;\"> The client&#8217;s brief includes a fixed launch date and budget. The sponsor signs the charter once a skills check confirms the agency has the staff it needs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Planning.<\/b><span style=\"font-weight: 400;\"> The team baselines scope, schedule, and budget. They build the capacity plan first, then assign named people to the schedule<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Execution.<\/b><span style=\"font-weight: 400;\"> Creative production runs in two-week sprints, with client feedback after each one. But, there\u2019s an issue. Demand peaks, and in sprint three the same two designers are booked on the campaign and on another client&#8217;s pitch<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Monitoring and controlling.<\/b><span style=\"font-weight: 400;\"> The clash shows up on the schedule before the sprint starts because the bookings were visible on the schedule. The project manager then moves the pitch work to a freelancer and updates the plan<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Closure.<\/b><span style=\"font-weight: 400;\"> The client accepts the final assets on delivery. The team records actual hours spent, allows the team to move onto new projects, and runs a lessons-learned review<\/span><\/li>\n<\/ul>\n<div class=\"callout callout--reading\">\n<p><span style=\"font-weight: 400;\"><strong>Further reading<\/strong>: Our guide to the <\/span><a href=\"https:\/\/resourceguruapp.com\/blog\/agencies\/agency-project-management-process\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">agency project management process<\/span><\/a><span style=\"font-weight: 400;\"> goes into more depth on how different agencies can adapt the project life cycle to their specific needs.\u00a0<\/span><\/p>\n<\/div>\n<h2><b>Critical success factors across the project life cycle<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Every project is different, but every <em>successful<\/em> project has a few things in common. Thankfully, once you\u2019ve familiarized yourself with these best practices, you set yourself up for a higher chance of delivering work on time, and on budget:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Clear, measurable objectives.<\/b><span style=\"font-weight: 400;\"> Set them at the initiation phase, with a number and a date, so everyone knows what \u201cdone\u201d actually means<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>A structured framework.<\/b><span style=\"font-weight: 400;\"> In PMI&#8217;s <\/span><a href=\"https:\/\/www.pmi.org\/about\/press-media\/2026\/pulse-why-complex-projects-fail-best-practices-are-not-enough-system-thinking\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Pulse of the Profession 2026<\/span><\/a><span style=\"font-weight: 400;\">, 72% of projects using a framework were considered successful, against 61% with no structured approach. Yet 35% of project professionals used no framework on their most recent complex project<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Gates every team respects.<\/b><span style=\"font-weight: 400;\"> Agree the exit criteria for each phase so every project in the organization closes a phase for the same reasons<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Scope control.<\/b><span style=\"font-weight: 400;\"> Check each change request against what was agreed up front before you commit to it\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Capacity by phase.<\/b><span style=\"font-weight: 400;\"> Review capacity at the start of each distinct phase to prevent schedule slips<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Open communication.<\/b><span style=\"font-weight: 400;\"> Share status and variances with stakeholders as they appear, not at the next gate<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">And, it doesn\u2019t hurt to get a pearl of wisdom from someone who\u2019s been in the project management game for over two decades. Here\u2019s Yad\u2019s top tip for closing out the project life cycle strong:\u00a0<\/span><\/p>\n<div class=\"quote quote--default quote--green\"><div class=\"quote__text\"><p>&#8220;At closure, I pay particular attention to the estimates that were wrong and why they were wrong. I want to know: Which of our estimates were way off and why? How did late-breaking information, slow approvals, or other delays impact the schedule?&#8221;<\/p>\n<\/div><div class=\"quote__author\"><div class=\"quote__author__cite\"><cite><p><strong>Yad Senapathy<\/strong> <span>Founder and CEO<\/span> <span>Project Management Training Institute<\/span><\/p><\/cite><\/div><\/div><\/div>\n<h2><b>Frequently asked questions about the project lifecycle<\/b><\/h2>\n<h3><b>What is project life cycle management?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Project life cycle management (sometimes styled as &#8220;project lifecycle management&#8221;) is the practice of guiding a project through each necessary phase, with defined deliverables, gates, and capacity checks. Organizations running many projects often assign it to a PMO.<\/span><\/p>\n<h3><b>What is the difference between a project life cycle and a project phase?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A project life cycle is the full sequence of phases from start to finish. A project phase is one stage within it, such as design or build, and each ends with a deliverable and a gate.<\/span><\/p>\n<h3><b>What is the difference between PMLC and SDLC?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">PMLC, the project management life cycle, covers how you manage any project from initiation to closure. SDLC, the software development life cycle, covers how software gets built specifically. A software project often applies the stages in both cycles.<\/span><\/p>\n<h2><b>Make every stage of the project life cycle manageable with software built for change<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Throughout our discussion of the project life cycle, we mentioned how important data accuracy and change management are. What we didn\u2019t go into in depth is <\/span><i><span style=\"font-weight: 400;\">where<\/span><\/i><span style=\"font-weight: 400;\"> you can keep track of that. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Resource Guru is resource management software that automatically detects clashes before they become blockers, makes changes seamless (even at the last second), and gives deep capacity insights at a glance.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Try it yourself for free to see how it can support you, at every stage:\u00a0<\/span><\/p>\n<div class=\"freetrial freetrial--text-light freetrial--alt\"><div class=\"freetrial__image\"><img loading=\"lazy\" decoding=\"async\" width=\"310\" height=\"286\" src=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial-alt-310x286.png\" class=\"attachment-freetrial size-freetrial wp-post-image\" alt=\"\" srcset=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial-alt-310x286.png 310w, https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2024\/02\/free-trial-alt.png 536w\" sizes=\"auto, (max-width: 310px) 100vw, 310px\" \/><\/div><div class=\"freetrial__text\"><h4>The #1 scheduling and time tracking tool trusted by thousands of project teams<\/h4>\n<p>Join thousands of project managers who have made scheduling a breeze.<\/p>\n<p><a class=\"button\" href=\"https:\/\/app.resourceguruapp.com\/\" rel=\"noopener\">Free Trial<\/a> <a class=\"button button--outline\" href=\"https:\/\/resourceguruapp.com\/contact-sales\" target=\"_blank\" rel=\"noopener\">Talk to Sales<\/a><\/p>\n<\/div><\/div>\n<p><em>Last updated: 10th November, 2026.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here. <\/p>\n","protected":false},"author":36,"featured_media":4084,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[38],"tags":[],"class_list":["post-4083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project life cycle: The 5 phases explained, with examples<\/title>\n<meta name=\"description\" content=\"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project life cycle: The 5 phases explained, with examples\" \/>\n<meta property=\"og:description\" content=\"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle\" \/>\n<meta property=\"og:site_name\" content=\"Work Life Balance Blog | Resource Guru\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ResourceGuru\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T13:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-10T14:23:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2084\" \/>\n\t<meta property=\"og:image:height\" content=\"1422\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Maria Keenan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@resourceguruapp\" \/>\n<meta name=\"twitter:site\" content=\"@resourceguruapp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Maria Keenan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle\"},\"author\":{\"name\":\"Maria Keenan\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#\\\/schema\\\/person\\\/2097afc17116a91459d79aaf944fa3a6\"},\"headline\":\"Project life cycle: The 5 phases, types, and examples\",\"datePublished\":\"2026-11-10T13:53:51+00:00\",\"dateModified\":\"2026-11-10T14:23:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle\"},\"wordCount\":2480,\"publisher\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/project-life-cycle.jpg\",\"articleSection\":[\"Project management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle\",\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle\",\"name\":\"Project life cycle: The 5 phases explained, with examples\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/project-life-cycle.jpg\",\"datePublished\":\"2026-11-10T13:53:51+00:00\",\"dateModified\":\"2026-11-10T14:23:49+00:00\",\"description\":\"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#primaryimage\",\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/project-life-cycle.jpg\",\"contentUrl\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/project-life-cycle.jpg\",\"width\":2084,\"height\":1422,\"caption\":\"Icons representing the five stages of the project life cycle: initiation, planning, execution, monitoring, closure.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\\\/project-life-cycle#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project management\",\"item\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/project-management\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Project life cycle: The 5 phases, types, and examples\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/\",\"name\":\"Work Life Balance Blog | Resource Guru\",\"description\":\"Work Life - a blog about work\\\/life balance and scheduling by Resource Guru\",\"publisher\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/#organization\",\"name\":\"Resource Guru\",\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/resource-guru-logo.png\",\"contentUrl\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/resource-guru-logo.png\",\"width\":1024,\"height\":512,\"caption\":\"Resource Guru\"},\"image\":{\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ResourceGuru\",\"https:\\\/\\\/x.com\\\/resourceguruapp\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/#\\\/schema\\\/person\\\/2097afc17116a91459d79aaf944fa3a6\",\"name\":\"Maria Keenan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g\",\"caption\":\"Maria Keenan\"},\"description\":\"\ud83d\udc4b Hi. I\u2019m Maria. I write for Resource Guru to help make your work days\u2014and days off\u2014better. I\u2019m always open to suggestions for topics we should cover, so please send yours to happytohelp@resourceguru.com\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/keenanmaria\\\/\"],\"url\":\"https:\\\/\\\/resourceguruapp.com\\\/blog\\\/author\\\/maria-keenan\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project life cycle: The 5 phases explained, with examples","description":"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle","og_locale":"en_US","og_type":"article","og_title":"Project life cycle: The 5 phases explained, with examples","og_description":"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.","og_url":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle","og_site_name":"Work Life Balance Blog | Resource Guru","article_publisher":"https:\/\/www.facebook.com\/ResourceGuru","article_published_time":"2026-11-10T13:53:51+00:00","article_modified_time":"2026-11-10T14:23:49+00:00","og_image":[{"width":2084,"height":1422,"url":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg","type":"image\/jpeg"}],"author":"Maria Keenan","twitter_card":"summary_large_image","twitter_creator":"@resourceguruapp","twitter_site":"@resourceguruapp","twitter_misc":{"Written by":"Maria Keenan","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#article","isPartOf":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle"},"author":{"name":"Maria Keenan","@id":"https:\/\/resourceguruapp.com\/blog\/#\/schema\/person\/2097afc17116a91459d79aaf944fa3a6"},"headline":"Project life cycle: The 5 phases, types, and examples","datePublished":"2026-11-10T13:53:51+00:00","dateModified":"2026-11-10T14:23:49+00:00","mainEntityOfPage":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle"},"wordCount":2480,"publisher":{"@id":"https:\/\/resourceguruapp.com\/blog\/#organization"},"image":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#primaryimage"},"thumbnailUrl":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg","articleSection":["Project management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle","url":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle","name":"Project life cycle: The 5 phases explained, with examples","isPartOf":{"@id":"https:\/\/resourceguruapp.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#primaryimage"},"image":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#primaryimage"},"thumbnailUrl":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg","datePublished":"2026-11-10T13:53:51+00:00","dateModified":"2026-11-10T14:23:49+00:00","description":"The project life cycle has 5 phases: initiation, planning, execution, monitoring and controlling, and closure. Learn best practices for every stage here.","breadcrumb":{"@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#primaryimage","url":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg","contentUrl":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/02\/project-life-cycle.jpg","width":2084,"height":1422,"caption":"Icons representing the five stages of the project life cycle: initiation, planning, execution, monitoring, closure."},{"@type":"BreadcrumbList","@id":"https:\/\/resourceguruapp.com\/blog\/project-management\/project-life-cycle#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/resourceguruapp.com\/blog"},{"@type":"ListItem","position":2,"name":"Project management","item":"https:\/\/resourceguruapp.com\/blog\/project-management"},{"@type":"ListItem","position":3,"name":"Project life cycle: The 5 phases, types, and examples"}]},{"@type":"WebSite","@id":"https:\/\/resourceguruapp.com\/blog\/#website","url":"https:\/\/resourceguruapp.com\/blog\/","name":"Work Life Balance Blog | Resource Guru","description":"Work Life - a blog about work\/life balance and scheduling by Resource Guru","publisher":{"@id":"https:\/\/resourceguruapp.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/resourceguruapp.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/resourceguruapp.com\/#organization","name":"Resource Guru","url":"https:\/\/resourceguruapp.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/resourceguruapp.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/10\/resource-guru-logo.png","contentUrl":"https:\/\/resourceguruapp.com\/blog\/wp-content\/uploads\/2023\/10\/resource-guru-logo.png","width":1024,"height":512,"caption":"Resource Guru"},"image":{"@id":"https:\/\/resourceguruapp.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ResourceGuru","https:\/\/x.com\/resourceguruapp"]},{"@type":"Person","@id":"https:\/\/resourceguruapp.com\/blog\/#\/schema\/person\/2097afc17116a91459d79aaf944fa3a6","name":"Maria Keenan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/04f5606deebba00d611dd631077f6a3d7a38a914e51e2d500bed875617f476f2?s=96&d=mm&r=g","caption":"Maria Keenan"},"description":"\ud83d\udc4b Hi. I\u2019m Maria. I write for Resource Guru to help make your work days\u2014and days off\u2014better. I\u2019m always open to suggestions for topics we should cover, so please send yours to happytohelp@resourceguru.com","sameAs":["https:\/\/www.linkedin.com\/in\/keenanmaria\/"],"url":"https:\/\/resourceguruapp.com\/blog\/author\/maria-keenan"}]}},"_links":{"self":[{"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/posts\/4083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/comments?post=4083"}],"version-history":[{"count":5,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/posts\/4083\/revisions"}],"predecessor-version":[{"id":10333,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/posts\/4083\/revisions\/10333"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/media\/4084"}],"wp:attachment":[{"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/media?parent=4083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/categories?post=4083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/resourceguruapp.com\/blog\/wp-json\/wp\/v2\/tags?post=4083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}